All ICAM Categories » Any Factor » LTA infrastructure design

Less than adequate infrastructure design

Please select a resource below to see more detail.


Information

Link:

Click here to view file.

Mine Type:

Surface Mine

Published:

Aug 1, 2002

Excavator Contact With 11,000V Overhead Power-Lines

After repairs at a workshop, a contractor's excavator was being trammed by a fitter to a position on the mine for collection by the ...

Click to see full details...


Information

Link:

Click here to view file.

Mine Type:

Any Mine Type

Published:

Apr 30, 1997

Truck Tray Contacts 66 kV Powerlines

After night shift ‘smoko’ an operator returned to his parked truck and raised the truck tray. In the dark, witnesses saw electric ...

Click to see full details...


Results

Here are the results.



©2020 ISOLgate