Collapse of precast concrete elements stored in fabricated racking

SA200904

Click here to view resource.

     Click a tab to view specific information about this listing...
  • COMPLIANCEgate

Information:

Eleven precast concrete elements (panels) weighing approximately 100 tonnes and stored in a steel rack on a local construction site collapsed on 9 March 2009. Fortunately there were no people in the vicinity of the rack at the time of the collapse but the elements and the rack struck and damaged a mobile crane on site.

The rack was not designed or tested to determine its safe load capacity and the large number of elements being stored arose from stockpiling as a result of the sequencing of erection.



Organisation:

NTWorkSafe

Click here to view details and other documents from NTWorkSafe.


Jurisdiction:

Relates to Northern Territory (NT)

Click here to view other documents within the coverage area.





Information:

PDF Document
Coverage:

Northern Territory

Author:

NTWorkSafe

Publisher:

Northern Territory Government

Published:

9 Mar 2009